Autodesk Pier 9 is a combination industrial workshop and office space for Autodesk’s Consumer Group. Lundberg Design designed a state-of-the-art workshop including a metal shop, wood shop, CNC shop, 3 D printing and laser cutting, along with a space for the Autodesk company “Instructables”. The space was designed to fit into the industrial historic character of the former cargo shed, which is part of the Embarcadero
More About Project
National Registered Historic District. The project was being designed to achieve LEED Platinum – Commercial Interiors, which would be the first LEED CI project at the Port. The project includes the installation of a PV Solar array to power the facilities. Premier acted as the construction manager and assisted Autodesk with the design, contracting, leasing, permitting and entitlements, construction and fit out.
- Project: Autodesk
- Address: Pier 9 #9, San Francisco, CA
- Website: https://www.autodesk.com/
- Square Footage: 27,000